PROTÉGÉ-GEES (Apprenticeship)
September 2025 – Present
Performed preventive maintenance on 400V & 6kV three-phase motors, both energized and de-energized
Conducted IR tests on 400V and 6kV motors to assess insulation condition based on PETRONAS Technical Standards (PTS)
Performed grounding and earthing insulation tests according to PTS
Assisted in preparing Job Hazard Safety Analyses (JHSA) to align maintenance tasks with safety requirements
Internship
July 2024 – October 2024
Redesigned wiring workflow, increasing wiring efficiency by 20% and reducing installation time
Joined two 50-core wires for engine projects to ensure consistent, reliable signal transmission
Troubleshot wiring issues with engineers and streamlined processes, reducing downtime by 15%
Documented wiring setups and changes, improving consistency and reducing future rework by 10%